This is a new facility for all Cushing Schools Pre-K through 4th Grade students. It includes 36 classrooms, 6 special education classrooms, 10 resource rooms, a computer lab, a music room, an art room, and a media center. It is designed with 2 gymnasiums for PE and a full-service cafeteria with a stage. Other areas include administration space, workroom, and all necessary support areas. It will include a Tornado Storm Shelter large enough to accommodate all students and staff in the building. An estimated cost for site development includes drives, parking, and a lighted walking trail is included in the cost. Total project cost $47,645,000.
This is a Tornado Storm Shelter addition used as a multi-purpose space at Cushing Middle School. There is money in the budget for a proposed playground area. Total project cost $3,650,000.
The freshman wing includes six new classrooms, two special education classrooms, and support areas. It will require the renovation of an existing classroom. The new concession has large restrooms, concessions, and a ticket booth. The site paving (circle drive) will need to be modified to make room for the new structures. Total project cost $5,915,000.
Adjacent to the Dora Hobbs Performing Arts Center, the space will include a large band room, office, and storage. Space in the existing high school will be converted into a smaller band room. The Fine Arts Building will be renovated into a new choir room and drama room. Total project cost $3,130,000.